I-29 & 12th Street Interchange
Sioux Falls, South Dakota
|
Synopsis of Work:
Work involved: Grading, Curb & Gutter, Storm Sewer, Sanitarty Sewer, Water Main Replacement, Structures, Roadway Lighting, Signals, Permanent Signing, Pavement Marking and PCC Pavement.
The overall completion date for the 12th St./Interstate 29 Interchange project was due June 29, 2007... View Project |
 |
Grading, Storm Sewer, Curb and Gutter, PCC Pavement, and Lighting
Lincoln County, Sioux Falls, South Dakota
|
Highlights:
* 4 driving lanes plus turn lanes
* Special median design
This project was located on South Dakota Highway 115. The project began at 69th Street and went 1.2 miles south. It consisted of two phases. The northbound lanes were reconstructed in 2007. The southbound lanes along with the median, sidewalk, top soiling, and seeding were all completed in 2008... View Project |
 |
Reconstruction of US 40/287 West of Kit
Kit Carson, Cheyenne County, Colorado
|
This project consisted of resurfacing and widening, placement of concrete overlay, drainage, two concrete box extensions, signing, striping, seeding and mulching, as well as other miscellaneous work on 7.48 miles of US 40/287 in Cheyenne County west of Kit Carson, Colorado.
Due to a high amount of truck traffic the project was built in four phases... View Project |
 |
I-76 Colorado
Sedgwick County, Colorado
|
Highlights:
* 38' wide mainline paving
* Grade A smoothness
The Sedgwick County Colorado project was the first project in the state of Colorado for UPCI. The project consisted of 10 miles of shoulder rehabilitaion, concrete fast track patching and 6.5 miles of 38' wide mainline concrete paving... View Project |
 |
Rawlins Streets - Spruce St. Reconstruction
Rawlins, Wyoming
|
Highlights:
* Owner completion date was set up to open up the entire project to traffic by July 2009
* The project was opened up to traffic by November 2008
* Contractor found an existing wooden water line still in service (estimated from 1920's).
The project was 1.03 miles long running through the heart of Rawlins, WY... View Project |
 |
Reconstruction of I-80 and Dewar Drive.
Rock Springs, Wyoming
|
Highlights:
* Reconstruction of I-80 east bound and west bound lanes - 4.5 miles in each direction.
* Eight bridge replacements
* New signal systems on Dewar Drive
* Over 500,000 cubic yards of dirt moved
* 87,000 cubic yards of concrete poured
Upper Plains Contracting, Inc... View Project |
 |
Gillette Streets (I-90 Interchange to US 14/16 Intersection)
Gillette, Wyoming
|
The project consisted of grading, draining, placing sub-base, crushed base, bituminous pavement surfacing, concrete pavement, curb and gutter, sidewalk, storm sewer system, sanitary sewer system, water main replacement, traffic signal system, roadway lighting system, fencing, and other miscellaneous work on 0... View Project |
 |
Junction of Highway 34 and Interstate 29
Moody County, South Dakota
|
This project consisted of replacing exsisting roadway with 9" PCCP concrete on each side of the structure over I-29 by the Colman exit on Highway 34. The amount of PCCP was around 10,157 square yards of surfacing, which amounts to 2,690 cubic yards of concrete.
We also contracted to do guard rail modifications of three structures... View Project |
 |
South Dakota I-29 - Southbound lanes from Exit 26 to Exit 18
Union County, South Dakota
|
The project was to perform reconstruction of the southbound lanes on I-29 in Union County, SD from Exit 26 to Exit 18. The work consisted of PCC pavement, salvage and stockpile of recycled material, asphalt concrete surfacing of the shoulders, culvert extensions, bridge deck overlay, and structure approach slabs. View Project |
 |
Reconstruction of Taxiway
Aberdeen, South Dakota
|
The Aberdeen Airport project was the reconstruction of taxiway "D". The existing taxiway was 50' x 6790' and associated connectors amounting to 50' x 1500'. The work included the salvage and stockpile of the existing surfaces, installing underdrain and subgrade excavation, placing Geotextile fabric, recycled asphalt, base course and 13" of PCC (concrete) pavement... View Project |
 |
Moody Co.
Moody, South Dakota
|
Nonreinforced PCC pavement, bridge approach modification, guardrail and culvert safety improvement. Interstate 29 SB lane from SD34 to 2 miles north of Exit 121. View Project |
 |
Potter, Sully Counties
Potter, South Dakota
|
Minor Concrete Pavement Restoration US Highways 83 & 212. US83 from Potter/Sully County line to US212 from the north junction with US83, east to Gettysburg, SD. View Project |
 |
Union County
Union, South Dakota
|
Remove & replace PPC pavement, PCC Pavement Repair, Asphalt Concrete Surfacing of Shuolders, Ramp Grading and Surfacing, Bridge Deck Overlay, Approach Slabs, Culvert Ends, Lighting, Signing, Pavement Marking and Guardrails. Location I29 NBL, from 0.5 miles north of Elk Point to the SD50, Exit 2 View Project |
 |
Belle Fourche, SD
Belle Fourche, South Dakota
|
Grading, Storm Sewer, Curb & Gutter, Traffice Signals, Lighting, PCC Pavement, Bridge Deck overlay, approach slabs, permanent signing. US Highway 85 from Hay Creek to Faulk Street in Belle Fourche. Water Main and Sanitary Sewer Improvements (US85 from Hay Creek to the Belle Fourche River in Belle Fourche) View Project |
 |
US18 Through Canton
Lincoln County, South Dakota
|
Synopsis of Work:
This project consisted of 4.7 miles of reconstruction on US 18 through Canton to the Iowa Line.
Construction started on March 17, 2003, with work sequenced in eight phases. The majority of the project was built half at a time to maintain traffic through the project. 2.7 miles of temporary road widening was constructed to provide enough roadway width to accommodate traffic... View Project |
 |
I-29/Madison Street
Sioux Falls, South Dakota
|
Synopsis of Work:
This project consisted of approximately 1.17 miles of Interstate 29 from south of Russell Street to the railroad bridges north of the 12 th Street Interchange, and approximately 1.03 miles of Madison Street from Marion Road to about 150’ east of the Louise Avenue intersection.
Interstate 29 was widened to 3 lanes of concrete pavement in both the south and northbound directions and has 10’ concrete shoulders... View Project |
 |
Hwy 12
Brown County, South Dakota
|
Concrete overlay of 8.5 miles 4 miles east of Aberdeen to just west of Groton. View Project |
 |
Ipswich, SD
Edmunds County, South Dakota
|
Complete reconstruction of 3 lanes of PCC paving in an urban setting.
View Project |
 |
East North Street
Rapid City, South Dakota
|
PROJECT OVERVIEW:
Complete reconstruction and concrete paving on East North Street in Rapid City, SD from just east of Herman Street to just west of Pine Street. –
Beginning on Tuesday May 28th, 2013 the East North Street project will begin... View Project |
 |
Reconstruction of Runway 15-33
Sioux Falls, South Dakota
|
This project was a runway reconstruction. It involved removing 150' wide existing asphalt sections and replacing them with PCCP concrete pavement on approximately 3,305' of the southern section of the runway. The north end of the runway received the same work for a distance of 942'. Reede Construction, Inc... View Project |
 |
Aurora-Davison County, (Plankinton), I-90
Plankinton, South Dakota
|
This project was unique as it was the largest awarded project in the state of South Dakota and was the largest stimulus funded concrete paving project in the country according to the 2009 FHWA’s ARRA National Review Team Final Report. The section of the Interstate between White Lake and Plankinton was initially built in 1967... View Project |
 |
Lyon County, Minnesota
County Road 5, Minnesota
|
Reede Construction, Inc. was the paving contractor for this project. The project had over 123,000 square yards of 7" concrete paving that was completed. View Project |
 |
Douglas County
Lawrence, Kansas
|
Reede Construction, Inc. is constructing a 4 lane divided highway on a new stretch of Hwy 59 south of Lawrence, KS. View Project |
 |
Catron Boulevard
Rapid City, South Dakota
|
Reede Construction, Inc. is revitalizing the Catron Boulevard bypass around Rapid City, SD. The existing road was a two lane road and Reede Construction, Inc. is constructing a 4 lane divided highway bypass. View Project |
 |
Keith County
Ogallala, Nebraska
|
Reede Construction, Inc. is working on I-80 east of Ogallala, Nebraska. The two year project is a stretch of interstate that is being reworked both east and west. Currently, we are resurfacing the eastbound lanes. View Project |